# Evidence Base This file separates directly inspected evidence from repository design decisions. Access date for all web sources below: 2026-07-26. ## Retained Sources ### CISA / NCSWIC: Leveraging the PACE Plan into the Emergency Communications Ecosystem - Publication page: https://www.cisa.gov/resources-tools/resources/leveraging-pace-plan-emergency-communications-ecosystem - Inspected PDF: https://www.cisa.gov/sites/default/files/2024-10/2024_NCSWICPTE_Leveraging_PACE_Plan_Emergency_Comms_Ecosystems.pdf - Issuer: Cybersecurity and Infrastructure Security Agency, with the National Council of Statewide Interoperability Coordinators Planning, Training, and Exercise Committee - Availability: live; publication page uses a 2024 file path, while the document footer says "As of 2023" - Authority class: primary-direct Supported claims and locators: | Claim | Locator | |---|---| | PACE plans establish redundant options when primary communications are disrupted or degraded | PDF page 1, Overview | | A proposed plan should be feasible, acceptable, suitable, distinguishable, and complete | PDF page 1, Groundwork | | Distinguishable backup paths must not rely on the impacted method or transmission medium | PDF page 1, Groundwork | | Plans should identify essential functions, authorized and available capabilities, limitations, personnel, and logistics | PDF page 1, Groundwork | | Users should be comfortable with backup systems, and organizations should practice plans in training and exercises | PDF page 2, Developing the PACE Plan | | Primary is day-to-day; Alternate backs up Primary; Contingency follows failure of Primary and Alternate; Emergency follows failure of the other levels | PDF page 2, Developing the PACE Plan | | Reusing a shared device or communications path does not provide useful progression | PDF page 2, Developing the PACE Plan | | Planning should account for outgoing and incoming capability and geographic effects at both ends | PDF page 2, Developing the PACE Plan | | PACE planning is collaborative and needs technical, operational, and administrative expertise | PDF page 3, Considerations | | Some organizations may lack resources for four communication methods, and Emergency may need to represent a no-communications condition | PDF page 3, Considerations | | Organizations must define trigger points between levels based on confirmed failure of the current mode | PDF page 4, PACE Triggers | | Regular training and exercises identify issues and lead to improvements | PDF page 4, Training and Exercises | This document does not prescribe a daily, monthly, quarterly, semiannual, or annual exercise cadence. It does not mention HSEEP, hot washes, AAR/IP workflows, corrective-action matrices, setup-time metrics, or success-rate metrics. ### GitHub Issue #159 - URL: https://github.com/magnus919/agent-skills/issues/159 - Issuer: repository owner - Publication date: 2026-07-27T00:25:33Z - Availability: live at access time - Authority class: primary-direct design contract - Locator: issue body, "Proposed change" and "Scope" - Contribution: defines the requested skill scope, required path fields, four reusable artifacts, authority and unknown-fact safeguards, five eval scenarios, and owner-approved completion condition. Issue requirements are repository product requirements, not external PACE doctrine. ### Wikipedia: PACE (communication methodology) - URL: https://en.wikipedia.org/wiki/PACE_(communication_methodology) - Issuer: Wikimedia community contributors - Publication date: continuously edited; inspected revision was last edited 2026-07-01 - Availability: live at access time - Authority class: secondary-direct - Locator: lead, "Order and scope," and "Development of PACE plans" - Contribution: discovery aid and summary of military-origin terminology. Normative skill instructions do not depend on this source where the inspected CISA guide or issue contract provides direct support. ## Excluded Or Limited Sources | Source | Decision | Reason | |---|---|---| | Michael S. Ryan, "A Short Note on PACE Plans" | Indirect only | The original link was unavailable during research; only a secondary quotation was inspected. | | DHS NIFOG v1.4 | Indirect only | The original link was archived and its relevant text was observed only through a secondary source. | | ARRL ARES Plan, July 2025 | Excluded from normative claims | The earlier research asserted PACE content without preserving a directly inspected supporting passage. | | CISA "What is a PACE Plan" announcement | Excluded as redundant | It adds awareness messaging but no needed operational detail beyond the retained guide. | | HSEEP doctrine | Excluded | No directly inspected HSEEP source was retained for this implementation, and issue #159 does not require HSEEP conformance. | ## Repository Design Decisions The six-stage workflow, explicit `UNKNOWN / OWNER / VALIDATION ACTION` notation, combined exercise/AAR template, troubleshooting sequence, and completion checklist are design decisions derived from issue #159 and repository conventions. They are not represented as universal PACE doctrine. The skill deliberately omits a CLI. The work is judgment- and plan-local-data-heavy; no repeated deterministic computation justifies executable code.