magnus919_agent-skills/incident-learning/references/verification-and-closure.md
Magnus HedemarkGitHubusername <username>factory-droid[bot] <138933559+factory-droid[bot]@users.noreply.github.com>
4f14ce3df6 feat(incident-learning): add incident-learning skill (#226)
Create incident-learning skill that converts operational incident and
near-miss evidence into verified, owned improvements across product,
code, tests, evals, operations, and governance domains.

- SKILL.md: progressive disclosure with loading guide, routing table,
  ownership boundaries, and core principles (evidence/inference/
  uncertainty separation, ticket-closure rejection, no-blame design)
- README.md: human-facing with all 5 required sections
- references/discovery-brief.md: bounded survey comparing SRE, QA,
  verification, agent-evals, product-lifecycle-learning,
  implementation-planning, resilience-and-recovery, production-readiness
- references/: evidence/inference taxonomy, escaped-from analysis,
  follow-up domains, verification and closure standard
- templates/: incident-learning record, causal/evidence ledger,
  follow-up work map, verification and closure record
- evals/evals.json: 5 schema-valid cases (noisy report, monitoring gap,
  process failure, agent authority failure, non-actionable rejection)
- Regenerated catalogs and updated root README and skill-triggers

Closes #200

Co-authored-by: username <username>
Co-authored-by: factory-droid[bot] <138933559+factory-droid[bot]@users.noreply.github.com>
2026-08-02 18:44:36 -04:00

7.2 KiB

Verification and Closure

Closure of an incident-learning follow-up item requires evidence that the intended change occurred and had the intended effect. Ticket creation is a process step — not closure. This reference defines the closure standard and the evidence required at each stage.

The closure standard

A follow-up item is closed when three conditions are met:

  1. Implementation evidence: The follow-up work was implemented. A code change was merged, a monitor was deployed, an eval case was added to the dataset, a requirement was updated and approved, a policy was enacted.
  2. Verification evidence: The implementation was verified against the intended change. The code change passes tests, the monitor fires under the incident condition, the eval case catches the failure mode, the policy is audited.
  3. Effect evidence: The intended effect was observed — or a revised hypothesis was recorded. The failure mode no longer occurs, the alert fires before the condition becomes critical, the eval case prevents regression. If the intended effect cannot yet be observed (e.g., the condition has not recurred), the follow-up remains open with a re-evaluation date.

What is NOT closure

The following are explicitly NOT sufficient for closure:

  • Ticket creation. Creating a Jira ticket, Linear issue, GitHub issue, or any task-tracker item is a process action — not evidence of change. A ticket is a container for follow-up work, not the work itself.
  • Ticket assignment. Assigning a ticket to an owner is a delegation action — not evidence of change.
  • Ticket status transition. Moving a ticket to "Done," "Resolved," or "Closed" in a tracker is a workflow action — not evidence of change. The tracker status and the incident-learning closure are independent; one can be "Done" while the other remains "Not Verified."
  • Acceptance in a sprint review. A demo or sprint review acceptance is a process checkpoint — not verification that the change prevents the incident from recurring.
  • "We'll handle it in the next cycle." Deferral is not closure. A deferred follow-up item remains open with a revised target date and a documented reason for deferral.
  • "The team discussed it and decided it's not a priority." A deprioritization decision is a rejection of the follow-up item — not closure. Rejected items must be recorded with a rejection reason and an explicit acceptance of the residual risk.

The closure record

Each follow-up item has a verification and closure record with these fields:

Field Description Required for closure
Follow-up ID Link to the follow-up work map item Yes
Implementation evidence What was implemented, with a reference (commit SHA, config change ID, document URL) Yes
Implementation date When the implementation was completed Yes
Verification evidence How the implementation was verified against the intended change, with a reference (test run, monitor fire log, eval result) Yes
Verification date When the verification was completed Yes
Effect evidence Evidence that the intended effect was observed, or a plan for when it will be observable Yes (or a re-evaluation date if not yet observable)
Closure authority Who approved the closure Yes
Closure date When the follow-up was closed Yes
Revised hypothesis If the effect was not as expected, what was learned and what follow-up replaces this one If applicable

Closure states

State Meaning Evidence required
Verified closed All three conditions met (implementation, verification, effect) Full closure record with all required fields
Verified closed — effect pending Implementation and verification complete; effect not yet observable (condition has not recurred) Implementation and verification evidence; re-evaluation date; rationale for why effect cannot yet be observed
Rejected Follow-up work was evaluated and intentionally not pursued Rejection reason; acceptance of residual risk; rejection authority; rejection date
Superseded Follow-up work was replaced by a different follow-up that addresses the same finding Link to the superseding follow-up item; reason for replacement
Open Follow-up work is in progress or not yet started Current status; owner; target date

Closure verification per domain

Domain Implementation evidence Verification evidence Effect evidence
Product Updated requirement document, specification, or design decision record Review approval, specification acceptance The requirement is referenced in implementation; the gap does not recur in subsequent incidents
Code Merged commit or PR Tests pass; the specific failure mode is reproduced and confirmed fixed The failure mode does not recur in production
Tests Test added to the test suite Test passes; test fails when the original failure condition is reintroduced (mutation verification) The test catches a regression or near-miss in a subsequent change
Evals Eval case added to the dataset Eval case fails against pre-fix system, passes against post-fix system The eval case catches a regression in a subsequent model or agent version
Operations Monitor, alert, or runbook deployed Monitor fires under the incident condition (fault injection or replay); runbook is exercised The alert fires before user impact in a subsequent occurrence; the runbook produces the expected outcome
Governance Policy, access control, or approval gate enacted The restricted action is attempted and blocked; the approval gate is exercised The governance change prevents a subsequent incident in the same category

Rejecting a follow-up item

A follow-up item may be rejected — intentionally not pursued. Rejection is a legitimate outcome when:

  • The cost of the follow-up outweighs the risk it addresses.
  • The follow-up would introduce more risk than it mitigates.
  • The finding is accepted as a known, tolerated risk.
  • A different follow-up addresses the same finding more effectively (record as "superseded," not "rejected").

A rejection is never silent. The rejection must be recorded with:

  • Rejection reason: Why the follow-up is not being pursued.
  • Residual risk acceptance: Explicit acknowledgment that the gap remains.
  • Rejection authority: Who made the rejection decision.
  • Rejection date: When the decision was made.

A rejected follow-up item is closed — it does not remain open indefinitely. The rejection is a conscious decision, not a forgotten item.

Tickets alone are not sufficient

This is the foundational closure rule:

Creating a ticket, task, or story is an action — not an outcome. Closure requires evidence that the intended change was implemented, verified, and had the intended effect. Tickets alone are not sufficient; a closure record must reference evidence of the implemented change.

This rule is enforced structurally: the closure record template has no field for "ticket ID" as a substitute for implementation, verification, or effect evidence. A ticket may be referenced as supplementary context, but it does not satisfy any of the three evidence requirements.