Probe attribution on Opus 5 showed the screenshot bound working (42
to 16) while the real burner ran free: five rounds of node -e
micro-edits, eight rebuilds, and inline defect hunts absorbed the
reviewer's and documenter's jobs until the turn cap killed the run
mid-hunt. The two-round ceiling now names scans, micro-edits, and
rebuilds; after the second round the build thread stops polishing and
ships the rest through the reviewer (one batched fix pass, one
rebuild, stop) and the documenter.
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>