Files
magnus919_agent-skills/pace-plan/references/evidence-base.md
username 64383d9aa5 feat(skill): add PACE plan lifecycle
Signed-off-by: username <username>
2026-07-26 21:11:42 -04:00

5.2 KiB

Evidence Base

This file separates directly inspected evidence from repository design decisions. Access date for all web sources below: 2026-07-26.

Retained Sources

CISA / NCSWIC: Leveraging the PACE Plan into the Emergency Communications Ecosystem

Supported claims and locators:

Claim Locator
PACE plans establish redundant options when primary communications are disrupted or degraded PDF page 1, Overview
A proposed plan should be feasible, acceptable, suitable, distinguishable, and complete PDF page 1, Groundwork
Distinguishable backup paths must not rely on the impacted method or transmission medium PDF page 1, Groundwork
Plans should identify essential functions, authorized and available capabilities, limitations, personnel, and logistics PDF page 1, Groundwork
Users should be comfortable with backup systems, and organizations should practice plans in training and exercises PDF page 2, Developing the PACE Plan
Primary is day-to-day; Alternate backs up Primary; Contingency follows failure of Primary and Alternate; Emergency follows failure of the other levels PDF page 2, Developing the PACE Plan
Reusing a shared device or communications path does not provide useful progression PDF page 2, Developing the PACE Plan
Planning should account for outgoing and incoming capability and geographic effects at both ends PDF page 2, Developing the PACE Plan
PACE planning is collaborative and needs technical, operational, and administrative expertise PDF page 3, Considerations
Some organizations may lack resources for four communication methods, and Emergency may need to represent a no-communications condition PDF page 3, Considerations
Organizations must define trigger points between levels based on confirmed failure of the current mode PDF page 4, PACE Triggers
Regular training and exercises identify issues and lead to improvements PDF page 4, Training and Exercises

This document does not prescribe a daily, monthly, quarterly, semiannual, or annual exercise cadence. It does not mention HSEEP, hot washes, AAR/IP workflows, corrective-action matrices, setup-time metrics, or success-rate metrics.

GitHub Issue #159

  • URL: https://github.com/magnus919/agent-skills/issues/159
  • Issuer: repository owner
  • Publication date: 2026-07-27T00:25:33Z
  • Availability: live at access time
  • Authority class: primary-direct design contract
  • Locator: issue body, "Proposed change" and "Scope"
  • Contribution: defines the requested skill scope, required path fields, four reusable artifacts, authority and unknown-fact safeguards, five eval scenarios, and owner-approved completion condition.

Issue requirements are repository product requirements, not external PACE doctrine.

Wikipedia: PACE (communication methodology)

  • URL: https://en.wikipedia.org/wiki/PACE_(communication_methodology)
  • Issuer: Wikimedia community contributors
  • Publication date: continuously edited; inspected revision was last edited 2026-07-01
  • Availability: live at access time
  • Authority class: secondary-direct
  • Locator: lead, "Order and scope," and "Development of PACE plans"
  • Contribution: discovery aid and summary of military-origin terminology.

Normative skill instructions do not depend on this source where the inspected CISA guide or issue contract provides direct support.

Excluded Or Limited Sources

Source Decision Reason
Michael S. Ryan, "A Short Note on PACE Plans" Indirect only The original link was unavailable during research; only a secondary quotation was inspected.
DHS NIFOG v1.4 Indirect only The original link was archived and its relevant text was observed only through a secondary source.
ARRL ARES Plan, July 2025 Excluded from normative claims The earlier research asserted PACE content without preserving a directly inspected supporting passage.
CISA "What is a PACE Plan" announcement Excluded as redundant It adds awareness messaging but no needed operational detail beyond the retained guide.
HSEEP doctrine Excluded No directly inspected HSEEP source was retained for this implementation, and issue #159 does not require HSEEP conformance.

Repository Design Decisions

The six-stage workflow, explicit UNKNOWN / OWNER / VALIDATION ACTION notation, combined exercise/AAR template, troubleshooting sequence, and completion checklist are design decisions derived from issue #159 and repository conventions. They are not represented as universal PACE doctrine.

The skill deliberately omits a CLI. The work is judgment- and plan-local-data-heavy; no repeated deterministic computation justifies executable code.