# Progress and Finality
|
|
|
|
How to judge whether work is advancing, when to keep going, when a bounded
|
|
check of an asynchronous dependency is justified, and when to stop or
|
|
escalate. One rule governs every section: **decide on semantic state — never
|
|
on elapsed time, iteration counts, timestamps, request IDs, or how many times
|
|
the same state has been observed.**
|
|
|
|
## Semantic progress, not iteration count
|
|
|
|
Progress means the world changed in a way that moves an acceptance criterion
|
|
forward: a changed artifact, a confirmed or falsified hypothesis, a new stage,
|
|
a changed dependency state, or a new output cursor from an asynchronous
|
|
system. An advancing timestamp, a fresh request ID, a poll counter, or the
|
|
continued existence of a process is *volatile churn* — it is not progress and
|
|
must never be recorded as evidence of progress.
|
|
|
|
Judge churn by content, not by source. A heartbeat whose only change is its
|
|
timestamp is churn. But a heartbeat that carries an advancing payload — a new
|
|
phase or step, a processed-item count, a new output cursor — is reporting
|
|
semantic state: record that payload in the declared semantic state, and it
|
|
counts as progress. The timestamp itself stays out of the fingerprint either
|
|
way.
|
|
|
|
The failure mode this page prevents is not "too many turns." It is repeated
|
|
observation of an unchanged semantic state while the declared stage action
|
|
remains untaken.
|
|
|
|
## The dependency contract
|
|
|
|
When a stage hands off to an asynchronous system, record — in the change
|
|
contract and the evidence ledger — whether a dependency is required for the
|
|
next stage:
|
|
|
|
- **Accepted/finished output with no required dependency:** the next action is
|
|
to advance or deliver, or to declare the run terminal-complete. A status
|
|
poll before that action is never justified.
|
|
- **A pending or failed dependency explicitly required for the next stage:**
|
|
a bounded check is justified once (see below). Required-or-not is part of
|
|
the contract, not something to re-derive mid-run.
|
|
|
|
Treat `accepted`/`finished` as a stage output, not automatically as whole-run
|
|
completion. Terminality is declared only when the contract has no required
|
|
dependency left.
|
|
|
|
## Bounded checks
|
|
|
|
One infrastructure check per normalized state fingerprint. The fingerprint is
|
|
computed from: stage, deliverable state, dependency state, whether the
|
|
dependency is required, and the declared semantic state. Volatile fields —
|
|
timestamps, request IDs, raw poll counters — are excluded from the
|
|
fingerprint, so a timestamp-only heartbeat difference is unchanged state. An
|
|
advancing heartbeat payload (a new phase, step count, or output cursor)
|
|
belongs in the declared semantic state; when it advances, the fingerprint
|
|
changes and the new state receives its own check allowance.
|
|
|
|
- First observation of a fingerprint: one check is allowed.
|
|
- The fingerprint changes (pending → succeeded, or a new output cursor):
|
|
continue; the new fingerprint gets its own check allowance.
|
|
- The fingerprint is unchanged: do not re-check. Change the mechanism or
|
|
escalate. An identical re-poll is a finality failure even when the
|
|
timestamp and request ID differ.
|
|
|
|
## Complex work
|
|
|
|
There is no arbitrary turn cap. Continue while each turn produces new
|
|
evidence or a changed semantic state and at least one acceptance criterion
|
|
remains unmet. Multi-turn diagnosis, design iteration, and long test loops
|
|
are productive work when the semantic state keeps changing; a turn-count
|
|
ceiling must never stop them.
|
|
|
|
## Active-process ledger
|
|
|
|
The evidence ledger stays canonical. When work is asynchronous — or an
|
|
escalation is being considered — extend the run's record with an
|
|
active-process entry:
|
|
|
|
| Field | Content |
|
|
|---|---|
|
|
| `id` | Stable identifier for the asynchronous hand-off. |
|
|
| `status` | Current normalized state. |
|
|
| `output` | Latest meaningful output or artifact reference. |
|
|
| `normalized_state` | Fingerprint inputs: stage, deliverable state, dependency state, dependency-required flag, semantic state. |
|
|
| `dependency_required` | Whether the dependency gates the next stage. |
|
|
| `next_action` | The declared stage action: `work`, `check`, `advance`, `deliver`, `complete`, `mechanism_change`, or `escalate`. |
|
|
| `expected_transition` | What the next *semantic* change would look like. |
|
|
| `checks_for_state` | How many checks this fingerprint has consumed. |
|
|
| `escalation_trigger` | The condition under which the next unchanged observation escalates. |
|
|
|
|
## Examples
|
|
|
|
**Accepted but not blocked.** The deliverable is accepted; a publish job is
|
|
pending, but nothing requires it before delivery. Correct: deliver or
|
|
complete now. Wrong: check the publish job first.
|
|
|
|
**Genuinely pending dependency.** The delivery stage requires a published
|
|
release. One check is spent; the next observation shows the dependency
|
|
succeeded with a new output cursor. Correct: proceed to delivery. If the
|
|
observation had been unchanged, the correct move is a mechanism change or
|
|
escalation — not a second check.
|
|
|
|
**Productive multi-step work.** Three turns on an in-progress deliverable,
|
|
each with a new hypothesis, benchmark, or artifact, ending in verification
|
|
and delivery. Correct at any length: every turn changed the semantic state.
|
|
|
|
**Identical re-poll (failure).** Two observations with identical semantic
|
|
state but different timestamps and request IDs, with a check on each, while
|
|
the delivery action stays untaken. This fails finality: the second check was
|
|
an identical re-poll; the response to the unchanged result should have been a
|
|
mechanism change or escalation.
|
|
|
|
## Non-portable examples excluded
|
|
|
|
Keep this contract harness-neutral. Do not express the rules in terms of
|
|
specific tool names, scheduler or cron identifiers, process IDs, platform API
|
|
names, or any vendor's polling semantics. Describe state, dependencies,
|
|
actions, and terminality; each harness maps them to its own mechanisms.
|