mirror of
https://github.com/magnus919/agent-skills.git
synced 2026-09-21 16:46:26 +03:00
Squash-merge verified business methodology depth at exact head 9ca552f4c0. Required validate and paired evaluation checks passed; advisory droid review had no blocking findings.
42 lines
3.0 KiB
Markdown
42 lines
3.0 KiB
Markdown
# Organization Design Decision Workflow
|
|
|
|
Use this workflow for topology, talent, reward, and culture choices; do not treat it as employment-law advice or a project plan.
|
|
|
|
## Repeatable Method
|
|
|
|
1. **Frame inputs:** strategy and value streams, required capabilities, team boundaries, decision rights, headcount/cash limits, locations, talent data, and employee experience risks.
|
|
2. **Model options:** compare topology and talent alternatives using cognitive load, dependencies, span, skill coverage, equity, manager capacity, and reversibility. Make assumptions explicit.
|
|
3. **Decide with gates:** choose only with accountable executives, role/decision-right artifacts, measurable health and delivery outcomes, consultation plan, and legal/employee-relations review where relevant.
|
|
4. **Validate:** pilot boundaries or hiring plan; review cycle time, dependency load, retention/engagement signals, inclusion impacts, and regretted attrition. Adjust without treating survey silence as approval.
|
|
5. **Package evidence:** maintain topology map, capability/talent matrix, leveling/reward assumptions, consultation record, risks, and review date using `artifact-pyramids`.
|
|
|
|
## Worked Example
|
|
|
|
A 60-person product company has overloaded platform engineers and slow releases. The decision creates one stream-aligned product team and a small platform team with explicit APIs and an enabling rotation. A 90-day pilot targets fewer cross-team dependencies, stable on-call load, and improved lead time; compensation changes are not inferred from topology and go through HR and counsel review.
|
|
|
|
## Reusable Artifact
|
|
|
|
```text
|
|
Org design decision record
|
|
Strategy/value stream / owner / date / review date
|
|
Capabilities and current topology:
|
|
Options, assumptions, equity and employee risks:
|
|
Decision rights, team boundaries, roles and spans:
|
|
Talent/reward implications and consultation:
|
|
Pilot measures (delivery, health, inclusion) and stop rules:
|
|
Evidence, dissent, approvals, and next review:
|
|
```
|
|
|
|
## Routing Matrix
|
|
|
|
| Need | Route to | Handoff in / out |
|
|
|---|---|---|
|
|
| Strategy and portfolio choice | [strategy-frameworks](../../strategy-frameworks/SKILL.md) | Capability constraint in; strategic choice out |
|
|
| Headcount or compensation economics | [financial-modeling](../../financial-modeling/SKILL.md) | Staffing assumptions in; scenario cost out |
|
|
| Technology capability evaluation | [technology-radar](../../technology-radar/SKILL.md) | Capability need in; technology options out |
|
|
| Hiring/reorg implementation | [implementation-planning](../../implementation-planning/SKILL.md) | Approved design in; sequenced work out |
|
|
| Evidence dossier | [artifact-pyramids](../../artifact-pyramids/SKILL.md) | Decisions and consultation record in; durable index out |
|
|
| Employment-law interpretation | [legal-strategy](../../legal-strategy/SKILL.md) | Proposed change in; counsel questions/constraints out |
|
|
|
|
Do not create a Phase 2 people specialty sibling. Route legal interpretation to counsel and delivery sequencing to implementation planning.
|