Move the 8 directories under bundles/ to the repo root via git mv and remove the now-empty bundles/ directory. Replace the "bundles" entry in pyproject.toml [tool.deptry] extend_exclude with the 8 moved dir names so the moved trees stay excluded from Python dependency analysis. Co-authored-by: factory-droid[bot] <138933559+factory-droid[bot]@users.noreply.github.com>
125 lines
6.5 KiB
Markdown
125 lines
6.5 KiB
Markdown
# Worked Example — Claims-Processing Cycle-Time Reduction
|
|
|
|
A synthetic engagement that calibrates the expected depth and evidence
|
|
labeling of the continuity artifacts. All people, numbers, and workflows are
|
|
illustrative; none reference a real customer, system, or deployment. Use this
|
|
to calibrate depth, not as a template substitute.
|
|
|
|
## Engagement charter (excerpt)
|
|
|
|
- **Engagement:** Claims-processing cycle-time reduction
|
|
- **Accountable technical lead:** Assigned engagement lead
|
|
- **Sponsor and decision authority:** Operations sponsor; privacy and security
|
|
owners gate data access; service owner approves production change
|
|
- **Stakeholders and intended users:** Claims processors, workflow
|
|
supervisors, downstream payment roles
|
|
- **Workflow and problem statement:** Elapsed time from claim submission to
|
|
decision is the target workflow. The bottleneck is unvalidated; no
|
|
particular stage is assumed to be the cause.
|
|
- **Desired outcome and baseline:** Reduce median cycle time by at least 10%
|
|
against a recorded 30-day baseline, without breaching agreed quality,
|
|
privacy, or compliance guardrails.
|
|
- **In scope:** Read-only workflow observation; baseline measurement; one
|
|
bounded intervention with a tested hypothesis.
|
|
- **Out of scope:** Claims policy changes; unapproved production changes;
|
|
external commitments.
|
|
- **Constraints:** Least-privilege access; approved change windows; retention
|
|
and deletion rules for claims data.
|
|
- **Success measure and decision rule:** Proceed to the next stage only when
|
|
the sponsor approves the metric definition, baseline, target, and guardrails
|
|
with named evidence.
|
|
- **Stop conditions:** No recognizable problem; no workflow access; authority
|
|
or constraints cannot be named; evidence fails; next action exceeds charter.
|
|
- **Sharing classification:** Private by default; reviewer and review date
|
|
recorded before any external sharing.
|
|
|
|
## Ledger entries (excerpt)
|
|
|
|
| ID | Type | Statement | Evidence / source | Confidence | Owner | Due / review | Status |
|
|
|---|---|---|---|---|---|---|---|
|
|
| A-001 | Assumption | Median cycle time is a material outcome for the engagement. | Source fact: engagement request names cycle-time reduction as the objective | High | Sponsor | Before solution design | Open |
|
|
| D-001 | Decision | No solution design until the charter establishes problem, users, workflow, outcome, scope, authority, constraints, success measure, and stop conditions. | Decision: engagement design gate | High | Sponsor and lead | Ratified | Active |
|
|
| R-001 | Risk | Optimizing cycle time could degrade claim quality if guardrails are not explicit. | Inference: guardrails not yet defined | Medium | Operational risk owner | Before hypothesis approval | Open |
|
|
|
|
## Stage handoff — Build to Evaluate (excerpt)
|
|
|
|
- **Entry evidence:** Approved requirement; thin-slice implementation plan with
|
|
owner; charter and ledger current.
|
|
- **Work performed:** Thin slice built and tested against acceptance criteria.
|
|
- **Source / evidence labels:** Each test result labeled engagement observation;
|
|
design choices labeled decisions.
|
|
- **Observed result:** Slice passes technical acceptance; no production claim.
|
|
- **Unknowns:** Production data behavior; operator workflow interaction.
|
|
- **Decision rule:** Advance to Evaluate when representative evidence exists.
|
|
- **Decision:** Advance to Evaluate.
|
|
- **Receiving owner / acceptance condition:** Evaluation owner accepts the
|
|
slice and baseline evidence.
|
|
|
|
## Evaluation and release decision (excerpt)
|
|
|
|
- **Baseline and decision thresholds:** Median 30-day cycle time; 10%
|
|
reduction rule; quality guardrails.
|
|
- **Representative evidence:** Workflow sample spanning claim types, channels,
|
|
and processor experience levels.
|
|
- **Adversarial or misuse evidence:** Boundary inputs, partial data, and
|
|
worst-case queue conditions.
|
|
- **Known constraints and residual risks:** One segment shows 8% adoption;
|
|
support owner not yet named.
|
|
- **Rollout / rollback prerequisites:** Authorized change window; recovery
|
|
path tested; verification method named.
|
|
- **Release decision:** Conditional — approve with the adoption plan and
|
|
support owner recorded as conditions.
|
|
|
|
## Adoption scorecard (excerpt)
|
|
|
|
- **Target workflow and users:** Claims processors in the two busiest teams.
|
|
- **Activation event:** First claim completed with the new path.
|
|
- **Adoption metric and decision rule:** 60% of eligible processors active
|
|
within 30 days.
|
|
- **Outcome metric and decision rule:** Median cycle-time reduction >= 10%
|
|
with quality guardrails intact.
|
|
- **Observed:** Team A 64% active; Team B 8% active.
|
|
- **Blockers recorded:** Team B workflow-fit and support evidence missing;
|
|
incentive alignment unexamined.
|
|
- **Interpretation:** Adoption gap is unexplained; more training or features
|
|
are not prescribed until access, fit, trust, support, and incentives are
|
|
distinguished.
|
|
|
|
## Outcome measurement record (excerpt)
|
|
|
|
- **Observed result:** 12% median reduction against the 10% rule.
|
|
- **Uncertainty and confounders:** Two-week window; concurrent process
|
|
changes; segment imbalance.
|
|
- **Decision:** Continue with the adoption intervention; re-measure at 60
|
|
days.
|
|
|
|
## Productization record (excerpt)
|
|
|
|
- **Observed local result:** 12% reduction; adoption strong in one segment,
|
|
weak in another.
|
|
- **Reuse hypothesis:** The intervention may transfer to similar
|
|
intake-to-decision workflows.
|
|
- **Classification:** Configuration — provisional, local-only. A single
|
|
positive outcome, weak adoption in one segment, and no willing receiving
|
|
owner are insufficient evidence for a reusable-pattern or product-capability
|
|
classification.
|
|
- **Reuse boundary:** Restricted to the current authorized context until
|
|
repeated need, transferable constraints, support economics, and a receiving
|
|
owner are evidenced.
|
|
- **Recommendation:** Candidate pattern for a pilot transfer; the receiving
|
|
product owner must approve a requirement before implementation-planning is
|
|
routed.
|
|
- **Decision authority and decision:** Pending; recommendation is not a
|
|
decision.
|
|
- **Field learning returned to:** Internal platform and product owners, with
|
|
the external-sharing gate applied.
|
|
|
|
## What this example is for
|
|
|
|
Calibrate the depth and evidence discipline expected of each artifact:
|
|
separate observations from inferences, apply the declared decision rule,
|
|
record missing evidence as bounded uncertainty, label every material entry,
|
|
and keep the classification and recommendation separate from any authorized
|
|
decision. Do not copy the illustrative numbers or the synthetic workflow into
|
|
a real engagement.
|