# Phase Gate Methodology
|
|
|
|
The four gates that enforce quality at each SDD phase transition. Every gate asks the same question: **"Is the artifact for this phase complete, correct, and unambiguous enough for the next phase to proceed safely?"**
|
|
|
|
## The Four Gates
|
|
|
|
```
|
|
SPECIFY → [GATE 1] → DECOMPOSE → [GATE 2] → IMPLEMENT → [GATE 3] → VERIFY → [GATE 4] → DELIVER
|
|
Spec Review Plan Review Impl Review Acceptance Review
|
|
```
|
|
|
|
## Gate 1: Spec Review
|
|
|
|
**Reviews:** SPEC.md
|
|
**Question:** Is the spec complete, unambiguous, and testable enough for work decomposition?
|
|
|
|
**Checklist:**
|
|
- [ ] Every acceptance criterion is testable (binary PASS/FAIL)
|
|
- [ ] Edge cases are explicitly enumerated, not implied
|
|
- [ ] Non-functional requirements have measurable thresholds
|
|
- [ ] Scope boundary is clear (explicit in-scope AND out-of-scope)
|
|
- [ ] Data contracts and interface definitions are sufficiently precise
|
|
- [ ] No section leaves room for the agent to make an unguided assumption
|
|
- [ ] Assumptions and open questions are documented
|
|
|
|
## Gate 2: Plan Review
|
|
|
|
**Reviews:** TASK-PLAN.md
|
|
**Question:** Does every spec requirement map to a task? Are dependencies real?
|
|
|
|
**Checklist:**
|
|
- [ ] Every specification requirement maps to at least one task
|
|
- [ ] Dependencies are real and spec-derived (not invented)
|
|
- [ ] Each task is independently implementable and verifiable
|
|
- [ ] Task sizes are appropriate for a single implementation session (30-120 min)
|
|
- [ ] The implementation handoff (CLAUDE.md, .cursorrules, AGENTS.md) accurately represents the spec and plan
|
|
- [ ] No task exceeds the scope of any single spec section
|
|
|
|
## Gate 3: Implementation Review
|
|
|
|
**Reviews:** Implementation output (code, config, docs) against TASK-PLAN.md
|
|
**Question:** Does the implementation satisfy all acceptance criteria for completed tasks?
|
|
|
|
This is NOT a general code review. It does not assess code style, test coverage, or architectural elegance. It checks only spec compliance.
|
|
|
|
**Checklist:**
|
|
- [ ] All task acceptance criteria are satisfied
|
|
- [ ] Any deviations from the spec are documented (not silently introduced)
|
|
- [ ] Implementation produces correct results for all specified inputs
|
|
- [ ] Error states are handled per the spec
|
|
- [ ] Interface contracts are honored (return types, error formats, status codes)
|
|
|
|
## Gate 4: Acceptance Review
|
|
|
|
**Reviews:** VERIFICATION.md
|
|
**Question:** Is the overall compliance score sufficient for delivery?
|
|
|
|
**Checklist:**
|
|
- [ ] All spec ACs are accounted for in the verification matrix
|
|
- [ ] BLOCKING failures are resolved (none remain open)
|
|
- [ ] CRITICAL failures have documented remediation plans or exceptions
|
|
- [ ] Compliance score meets the project threshold (typically >90%)
|
|
- [ ] Any exceptions are documented with owner and due date
|
|
|
|
## Gate Decision Format
|
|
|
|
Every gate produces one of three verdicts:
|
|
|
|
| Verdict | Meaning | What happens next |
|
|
|---------|---------|-------------------|
|
|
| APPROVED | Artifact passes all criteria. Next phase may proceed. | Deliver artifact to next phase |
|
|
| CONDITIONS | Artifact passes subject to specific remediations that don't require full re-review | Deliver artifact + conditions list; next phase may proceed while conditions are resolved |
|
|
| REJECTED | Artifact fails one or more criteria. Current phase must produce a revised artifact. | Return artifact to current phase; no downstream work starts |
|
|
|
|
## Finding Severity
|
|
|
|
| Severity | Definition | Disposition |
|
|
|----------|-----------|-------------|
|
|
| BLOCKING | Issue makes the next phase impossible or produces guaranteed-defective output | Gate cannot pass |
|
|
| CRITICAL | Issue significantly impacts quality but next phase can proceed with documented exception | Gate passes with conditions |
|
|
| MINOR | Issue should be fixed but doesn't block the phase | Gate can pass with remediation plan |
|
|
| INFO | Observation or suggestion, no correctness impact | Informational |
|
|
|
|
## Escalation
|
|
|
|
When the reviewer and artifact author disagree on a finding:
|
|
|
|
1. Document the disagreement — what the artifact says, what the reviewer found, why the author disagrees
|
|
2. Escalate to the human orchestrator if the finding is BLOCKING or CRITICAL
|
|
3. MINOR and INFO disagreements are resolved by the reviewer's determination — the gate is not delayed for editorial preferences
|
|
|
|
## The Gate Philosophy
|
|
|
|
In SDD, quality is not enforced by code review — that's too late. Quality is enforced by the phase gate. A defect caught at Gate 1 (spec review) costs minutes to fix. The same defect caught at Gate 4 (acceptance review) costs hours — the implementation may need to be discarded and rewritten against a corrected spec.
|
|
|
|
This is the fundamental insight: **shift quality left.** The cheapest defect is the one caught before a single line of code is written.
|